Set Home Add Favorite 中文版
Products More>>
 
Culture More>>
Contact Us
Lifting Electromagnet Co., Ltd
Address: Yueyang Lengshuipu 888
Tel:+86-730-8611511
Fax:+86-730-8639848
Service Hotline:13873019788
E-mail:qzdct@126.com
Website:www.qzdct.com
Cable reel Position Navigation:Home >> Cable reel >> Details

Cable reel Overview

Source:Lifting Electromagnet Co., Ltd Yueyang  Date:2011/8/27 9:41:41  Popularity:
Selection Guide
1, our company can design and manufacture all kinds of cable reel, the signal reel, hose (the transmission of gas or liquid) roll.
2, cable lighter, shorter distance, generally use the scroll spring as the driving force, the weight of heavy cable, long distance, the general torque motor or a three-phase asynchronous motor (hysteresis) as the driving force. Under field conditions, but also use external drives or hammer as the driving force.
3, the winding length of the cable installation diagram "L" as the basis, with cable lengths of: (1) means A is L +3 laps? crow (2) mode B is L + h +3 laps? crow (3) methods C, D for L + H + h +3 laps? crow (4) means E, F, determined in accordance with the user-site, specify when ordering.
4, method C, fixed roll on the ground, close, release the cable, the cable and the relative motion between the ground. In this case, the trajectory in the context of laying the cable raceway to reduce cable wear.
5, generally by way of F H = 0.14L, h = 0.5H considerations, such as H <0.14L, h <0.5H, then the order must indicate the H, h values.
6, the cable reel mounted on a single beam for driving with the electric hoist equipped with, it can accompanied by a special roller bracket assembly for installation.
7, the cable reel of the "cable exit direction" in the dimension graph are labeled, any special requirements please specify.
8, dimension table indicate the weight, not including cable (duct) in weight.
9, electric structure of cantilevered roll, shape number is not in the product labeling.
10, the cable length exceeds 30 meters (including 30 meters) cable by user.

 

 

 Roll Model Description:  

   

Installation diagram:

 

 

 

 A-way vertical take-up

 B-mode vertical take-up by changing the wheel

 C-level ground take-up means (drum fixed)

 

 

 

 Way D-level ground take-up (roll movement)

 E-level floating winding way

 F-floating winding way

Address: Yueyang City, Yueyang Tower district Lengshuipu 888  Tel:0730-8611511   Technical Service Hotline:13873019788   E-mail: qzdct@126.com
Lifting Electromagnet Co., Ltd Yueyang  Copyright © 1998 - 2011 All Rights Reserved.
湘ICP备05015314号
ICP:05015314
  Technical Support:1+1科技